Esperanza Park, Cathedral City
Verde Design was engaged to deliver design services for a 12-acre community park in the Town of Apple Valley.
Verde Design was engaged to deliver design services for a 12-acre community park in the Town of Apple Valley.
Verde Design was engaged by the City of South San Francisco due to our specialized knowledge in the creation of multi-sport fields featuring synthetic turf, with the objective of enhancing both usage and programming.
Working within a tight 4.5-acre footprint, we were able to design four full size adult softball fields by using tall fencing on two of the fields to maintain an average home run distance of 300 feet.
Verde Design was selected by the City of Bakersfield to provide design services for the City’s remaining 95 acres of undeveloped parkland for Kaiser Permanente Sports Village.
The City of Tracy selected Verde Design to prepare a master plan and construction documents for a 166-acre sports park, which will be built in phases.
The City of Alameda has initiated the design and construction of the first phase of the Estuary Park Athletic Field Complex project.
Verde Design was selected to design and deliver athletic improvements as part of the Santa Cruz City School District’s effort to provide safe and durable athletic facilities to its student athletes.
In 2017, the City of Burlingame undertook the initiative to transform Murray Field from a natural grass surface to a synthetic turf field.
The City of Brentwood selected Verde Design to lead the planning, schematic design, and construction documentation for its Sand Creek Sports Complex.
AFE Sports selected to partner with Verde Design, capitalizing on our firm’s extensive knowledge in the design of parks and athletic facilities, to create the landscape architecture and civil engineering plans essential for the establishment of a five-a-side soccer and futsal court at the existing Cesar Chavez Campesino Park in Santa Ana.